Manufacturing Computer Solutions - The definitive it guide for UK manufacturers
 
 
Search :   Search Help    login

48 hours ROI from staff scheduling 01/01/2006
 
Cooper-Avon Tyres in Wiltshire says it got return on investment from its scheduling software in just two days – by eliminating conflicts with engineering staff rotas. The firm runs 24/7 with 1,000 staff, and was finding paper-based scheduling impossible because of the need to rotate staff coverage
 
Author
Brian Tinham
 
 
Download Articles
 
 Line-side in-sequence_multi.pdf
 
This material is protected by Findlay Publications copyright 2008.
See Terms and Conditions.
One-off usage is permitted but bulk copying is not.
For multiple copies contact the sales team.
Email this article
 
Bookmark this article using:
 
Del.icio.us digg reddit Facebook StumbleUpon
 
News Item
Download Articles
 
 Line-side in-sequence_multi.pdf
 
 
News Item
Linked Companies
 
 Amazon.com International Sales Inc
 
 
News Item
Similar News Articles
 
  Samsung SDSE saves 20% supply chain costs with Inovis
 
  Barloworld Optimus makes it to Top 100 supply chain solutions
 
  Osram lights up on GXS B2B trading grid
 
  SAP TechEd season imminent and coming to Berlin
 
  Business Objects and SAP deliver integrated intelligence to SMEs
 
 
News Item
Similar Reference Zone Articles
 
  Fast lessons take to the air
 
  Size matters
 
  Essential differential
 
  Racing uncertainty
 
  Cast the net