Manufacturing Computer Solutions - The definitive it guide for UK manufacturers
 
 
Site Search :   Search Help   login

Computing grid ready for Large Hadron Collider restart 03/07/2009
 
grid computing system The massive compute power needed to support the experiments at the Large Hadron Collider (LHC ) has passed all tests mimicking the load when the world's most powerful particle accelerator finally restarts later this year.

After months of preparation and two intensive weeks of continual operation, the Worldwide LHC Computing Grid (wLCG) says it has demonstrated that it is ready to support the massive growth in LHC users once data taking commences.

wLCG combines the IT power of more than 140 computer centres – the result of collaboration between 33 countries. The UK features very strongly throughout – contributing 21 of these sites and a staggering 15,000 computers. UK facilities are all managed by GridPP, funded by the Science and Technology Facilities Council (STFC).

While there have been several large-scale data-processing tests in recent years, the latest exercise, codenamed STEP'09, was the first full demonstration involving all key elements, from data taking at CERN through to analysis of data at the individual sites worldwide.

GridPP reports that the main ATLAS experiment alone successfully ran close to 1 million analysis jobs and achieving 6Gbps of grid traffic over long periods – yes, that's the equivalent of a DVD worth of data every second.

"Unlike previous challenges, which were dedicated testing periods, STEP'09 was a production activity that closely matches the types of workload that we can expect during LHC data taking. It was a demonstration not only of the readiness of experiments, sites and services but also the operations and support procedures and infrastructures," comments Ian Bird, leader of the wLCG project.
 
Author
Brian Tinham
 
Email this article
 
Bookmark this article using:
 
Del.icio.us digg reddit Facebook StumbleUpon
 
News Item
Similar News Articles
 
  UK’s most powerful supercomputer starts work at AWE
 
  SAP’s in-memory computing to change face of real time business intelligence
 
  Half of organisations expect cloud to enable creativity and growth
 
  Fifty percent of firms say cloud computing improves security
 
  HP helps manufacturers break IT improvement gridlock
 
 
News Item
Similar Reference Zone Articles
 
  Being able to say 'Yes'
 
  Always on?
 
  Who grasps virtual space
 
  Horses for courses in today’s race for storage
 
  Disk-to-disk-to-tape takes 80% off back-up times